IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0855 # 18 Y:2013 18 2013 INSULATE BARE EQUIPMENT $258 $960 Not Implemented
OK0855 # 19 Y:2013 19 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,292 $6,796 Not Implemented
OK0855 # 20 Y:2013 20 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,823 $3,063 Not Implemented
OK0855 # 21 Y:2013 21 2013 OPTIMIZE PLANT POWER FACTOR $17,798 $13,508 Implemented
OK0858 # 01 Y:2013 01 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $40,042 $20,360 Not Implemented
OK0858 # 02 Y:2013 02 2013 INSTALL SET-BACK TIMERS $1,493 $172 Not Implemented
OK0858 # 03 Y:2013 03 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,082 $19,800 Not Implemented
OK0858 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $1,338 Implemented
OK0858 # 05 Y:2013 05 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $32,018 $268,800 Not Implemented
OK0858 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,454 $63,252 Not Implemented
OK0858 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,717 $66,757 Not Implemented
OK0858 # 08 Y:2013 08 2013 DISCONNECT BALLASTS $6,565 $3,020 Not Implemented
OK0858 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,791 $1,220 Not Implemented
OK0850 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,313 $16,254 Not Implemented
OK0850 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $500 $451 Not Implemented
OK0850 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $123 $307 Not Implemented
OK0850 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $906 $337 Implemented
OK0850 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,925 $14,793 Not Implemented
OK0850 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $594 $2,670 Not Implemented
OK0850 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $654 Not Implemented
OK0850 # 08 Y:2013 08 2013 INSTALL TIMERS AND/OR THERMOSTATS $2,079 $159 Not Implemented
OK0850 # 09 Y:2013 09 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $434 $2,080 Implemented
OK0850 # 10 Y:2013 10 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $212 $1,200 Not Implemented
OK0850 # 11 Y:2013 11 2013 OPTIMIZE PLANT POWER FACTOR $2,693 $11,638 Not Implemented
OK0850 # 12 Y:2013 12 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,356 $14,994 Not Implemented