IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0429 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $772 $1,100 Not Implemented
LE0429 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,605 $12,500 Not Implemented
LE0429 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,711 $33,950 Not Implemented
LE0429 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,334 $5,100 Not Implemented
LE0429 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $566 $2,525 Not Implemented
LE0429 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,753 $8,500 Not Implemented
LE0427 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,735 $1,000 Implemented
LE0427 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,286 $1,200 Implemented
LE0427 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,823 $14,438 Implemented
LE0427 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,621 $5,775 Implemented
LE0427 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,580 $3,500 Implemented
LE0427 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,186 $5,500 Not Implemented
LE0425 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,005 $35 Implemented
LE0425 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,485 $1,000 Implemented
LE0425 # 03 Y:2016 03 2016 INSTALL TIMERS AND/OR THERMOSTATS $1,026 $370 Implemented
LE0425 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,151 $8,250 Not Implemented
LE0425 # 05 Y:2016 05 2016 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $12,871 $25,000 Not Implemented
LE0425 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,276 $29,625 Not Implemented
LE0425 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $3,225 Implemented
LE0425 # 08 Y:2016 08 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,118 $56,700 Not Implemented
LE0424 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,742 $1,000 Implemented
LE0424 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,378 $600 Implemented
LE0424 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $7,795 $2,750 Implemented
LE0424 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $825 $500 Not Implemented
LE0424 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,065 $3,420 Implemented