IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0546 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,466 $37,682 Not Implemented
OR0546 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,406 $1,600 Not Implemented
OR0546 # 08 Y:2009 08 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,132 $13,620 Not Implemented
OR0546 # 09 Y:2009 09 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $3,251 $1,456 Not Implemented
IC0159 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,803 $27,853 Not Implemented
IC0159 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $443 $162 Not Implemented
IC0159 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $1,629 $1,927 Not Implemented
IC0159 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $171 $238 Not Implemented
IC0159 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,906 $0 Not Implemented
IC0159 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,212 $5,316 Not Implemented
IC0159 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $157 $0 Not Implemented
IC0159 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $322 $575 Not Implemented
IC0159 # 09 Y:2009 09 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $780 $5,456 Not Implemented
IC0159 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $14,132 $5,776 Not Implemented
IC0159 # 11 Y:2009 11 2009 REPAIR AND ELIMINATE STEAM LEAKS $2,694 $57 Not Implemented
IC0159 # 12 Y:2009 12 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $166 $0 Not Implemented
LE0290 # 01 Y:2009 01 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,385 $1,200 Not Implemented
LE0290 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,837 $15,700 Not Implemented
LE0290 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,929 $2,000 Not Implemented
LE0290 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,543 $750 Implemented
LE0290 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,148 $152 Not Implemented
LE0290 # 06 Y:2009 06 2009 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,400 $500 Not Implemented
LE0290 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,267 $0 Implemented
LE0290 # 08 Y:2009 08 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,204 $2,500 Implemented
LE0290 # 09 Y:2009 09 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,150 $2,500 Implemented