Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,165
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0316 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,450 | $3,794 | n/a |
IC0316 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,039 | $346 | n/a |
IC0316 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $198 | $144 | n/a |
IC0316 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $21,124 | $3,628 | n/a |
IC0316 # 08 Y:2025 | 08 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,349 | $3,386 | n/a |
IC0316 # 09 Y:2025 | 09 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,406 | $3,393 | n/a |
IC0316 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $525 | $205 | n/a |
IC0316 # 11 Y:2025 | 11 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,060 | $0 | n/a |
IC0316 # 12 Y:2025 | 12 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,025 | $1,615 | n/a |
IC0316 # 13 Y:2025 | 13 | 2025 | REPLACE BOILER | $36,754 | $57,900 | n/a |
SF0628 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $72,544 | $0 | n/a |
SF0628 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,482 | $770 | n/a |
SF0628 # 03 Y:2025 | 03 | 2025 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $1,061 | $6,460 | n/a |
WM0228 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,416 | $0 | n/a |
WM0228 # 02 Y:2025 | 02 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,628 | $3,197 | n/a |
WM0228 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,531 | $4,430 | n/a |
WM0228 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,292 | $1,200 | n/a |
DL0247 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $350 | $0 | n/a |
DL0247 # 02 Y:2025 | 02 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,382 | $0 | n/a |
DL0247 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,671 | $0 | n/a |
DL0247 # 04 Y:2025 | 04 | 2025 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $1,592 | $0 | n/a |
DL0247 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $399 | $0 | n/a |
DL0247 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $993 | $0 | n/a |
DL0247 # 07 Y:2025 | 07 | 2025 | METER WASTE WATER | $34,580 | $145 | n/a |
DL0247 # 08 Y:2025 | 08 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $27,958 | $200,000 | n/a |