IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0176 # 05 Y:1999 05 1999 USE LESS WASTEFUL PACKAGING $2,479 $1,300 Not Implemented
AR0176 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,964 $17,500 Not Implemented
AR0175 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $142 $0 Not Implemented
AR0175 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $993 $153 Not Implemented
AR0175 # 03 Y:1999 03 1999 INCREASE USE OF AUTOMATION $5,548 $8,000 Not Implemented
AR0175 # 04 Y:1999 04 1999 INCREASE USE OF AUTOMATION $1,249 $3,000 Not Implemented
AR0174 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $759 $1,307 Not Implemented
AR0174 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $176 $0 Not Implemented
AR0174 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,097 $21,814 Not Implemented
AR0174 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $22,202 $180 Not Implemented
AR0174 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,046 $402 Not Implemented
AR0174 # 06 Y:1999 06 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $6,894 $280 Not Implemented
AR0173 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,113 $0 Not Implemented
AR0173 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,436 $60 Not Implemented
AR0173 # 03 Y:1999 03 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,514 $8,000 Not Implemented
AR0173 # 04 Y:1999 04 1999 INCREASE USE OF AUTOMATION $12,013 $3,109 Not Implemented
AR0172 # 01 Y:1999 01 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $158 $238 Not Implemented
AR0172 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $74 $120 Not Implemented
AR0172 # 03 Y:1999 03 1999 MINIMIZE WATER USAGE $352 $900 Not Implemented
AR0172 # 04 Y:1999 04 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,802 $8,767 Not Implemented
AR0172 # 05 Y:1999 05 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $9,600 $1,000 Not Implemented
AR0171 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $693 $807 Not Implemented
AR0171 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $230 $0 Implemented
AR0171 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,414 $800 Implemented
AR0171 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $21,142 $630 Implemented