Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Arkansas |
---|---|
Assessment Year | 1999 |
Principal Product | Machine Tool Accessories |
NAICS | n/a |
SIC | 3545 - Machine Tool Accessories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 194 |
Plant Area (Sq.Ft.) | 59,150 |
Annual Production | 190,000,000 Pieces |
Production Hrs. Annual | 7,280 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $148,961 | 6,722,157 | kWh | $0.02 |
Electricity Demand | $52,783 | 12,419 | kW-months/year | $4.25 |
Natural Gas | $2,720 | 524 | MMBtu | $5.19 |
TOTAL ENERGY COSTS | $213,209 | |||
RECOMMENDED SAVINGS* | $17,129 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $659 Cost: $1,135 |
$530 | 17,585 | $129 | 30 | - | - | - | - |
$530 17,585 kWh |
$129 30 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $4,051 Cost: $360 |
$3,235 | 146,835 | $816 | 192 | - | - | - | - |
$3,235 146,835 kWh |
$816 192 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $30 Cost: $287 |
$24 | 1,172 | $6 | 2 | - | - | - | - |
$24 1,172 kWh |
$6 2 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $946 Cost: $2,237 |
$524 | 23,740 | $422 | 99 | - | - | - | - |
$524 23,740 kWh |
$422 99 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1162 USE LESS WASTEFUL PACKAGING |
Savings: $2,479 Cost: $1,300 |
- | - | - | - | $2,479 | - | - | - |
- - kWh |
- - kW-months/year |
$2,479 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $8,964 Cost: $17,500 |
- | - | - | - | - | - | $8,964 | - |
- - kWh |
- - kW-months/year |
- - $ |
$8,964 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,129 Cost: $22,819 |
$4,313 | 189,332 | $1,373 | 323 | $2,479 | - | $8,964 | - | $4,313 189,332 kWh |
$1,373 323 kW-months/year |
$2,479 - $ |
$8,964 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Ancillary Material Cost | Primary Product |