IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0507 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,053 $13,600 Implemented
MI0246 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $30,416 $2,300 Implemented
MI0246 # 02 Y:2013 02 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $14,747 $17,000 Implemented
MI0246 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,442 $1,660 Implemented
MI0246 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $2,851 $417 Not Implemented
MI0246 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,190 $2,520 Not Implemented
MI0246 # 06 Y:2013 06 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,076 $6,910 Not Implemented
MI0246 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,508 $4,420 Implemented
MI0246 # 08 Y:2013 08 2013 PAY BILLS ON TIME TO AVOID LATE FEES $945 $240 Implemented
MI0246 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $876 $80 Implemented
IP0018 # 01 Y:2013 01 2013 APPLY FOR INVESTMENT INCENTIVES $42,227 $0 Not Implemented
IP0018 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $109,212 $0 Implemented
IP0018 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,467 $430 Not Implemented
IP0018 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $734 $100 Not Implemented
IP0018 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,545 $1,400 Implemented
IP0018 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $5,669 $2,019 Not Implemented
IP0018 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $99,761 $59,384 Implemented
UA0108 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,157 $800 Implemented
UA0108 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $1,900 Implemented
UA0108 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $4,734 $858 Implemented
UA0108 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $145 $607 Not Implemented
UA0108 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,894 $490 Implemented
UA0108 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,603 $2,591 Implemented
UA0108 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,872 $1,425 Not Implemented
UA0108 # 08 Y:2013 08 2013 INSTALL TIMERS AND/OR THERMOSTATS $2,099 $152 Implemented