Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2013 |
Principal Product | Spray Dried Porcine Product |
NAICS | 311611 - Animal (except Poultry) Slaughtering |
SIC | 2048 - Prepared Feeds, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 33 |
Plant Area (Sq.Ft.) | 50,551 |
Annual Production | 18,500,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $298,828 | 3,626,520 | kWh | $0.08 |
Electricity Demand | $89,000 | 10,476 | kW-months/year | $8.50 |
Natural Gas | $390,799 | 80,992 | MMBtu | $4.83 |
TOTAL ENERGY COSTS | $778,627 | |||
RECOMMENDED SAVINGS* | $68,682 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $67,340 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,483 Cost: $4,993 |
$7,280 | 74,131 | $1,203 | 119 | - | - |
$7,280 74,131 kWh |
$1,203 119 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,279 Cost: $1,198 |
$1,098 | 13,328 | $181 | 21 | - | - |
$1,098 13,328 kWh |
$181 21 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,933 Cost: $2,826 |
$2,933 | 35,584 | - | - | - | - |
$2,933 35,584 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $9,686 Cost: $7,803 |
- | - | - | - | $9,686 | 2,005 |
- - kWh |
- - kW-months/year |
$9,686 2,005 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $13,342 Cost: $1,000 |
- | - | - | - | $13,342 | 2,762 |
- - kWh |
- - kW-months/year |
$13,342 2,762 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $1,342 Cost: $500 |
- | - | - | - | $1,342 | 272 |
- - kWh |
- - kW-months/year |
$1,342 272 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $792 Cost: $650 |
$681 | 8,265 | $111 | 13 | - | - |
$681 8,265 kWh |
$111 13 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $576 Cost: $25 |
$494 | 5,990 | $82 | 10 | - | - |
$494 5,990 kWh |
$82 10 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $4,196 Cost: $10,318 |
$3,474 | 42,173 | $722 | 85 | - | - |
$3,474 42,173 kWh |
$722 85 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $26,053 Cost: $13,600 |
$22,827 | 277,025 | $3,226 | 384 | - | - |
$22,827 277,025 kWh |
$3,226 384 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $68,682 Cost: $42,913 |
$38,787 | 456,496 | $5,525 | 632 | $24,370 | 5,039 | $38,787 456,496 kWh |
$5,525 632 kW-months/year |
$24,370 5,039 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $67,340 Cost: $42,413 |
$38,787 | 456,496 | $5,525 | 632 | $23,028 | 4,767 | $38,787 456,496 kWh |
$5,525 632 kW-months/year |
$23,028 4,767 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |