IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0035 # 01 Y:1985 01 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,550 $50 Implemented
CO0035 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,285 $2,000 Implemented
CO0035 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $20 Implemented
CO0035 # 04 Y:1985 04 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,959 $4,000 Implemented
CO0035 # 05 Y:1985 05 1985 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,596 $24 Implemented
CO0035 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,229 $6,000 Implemented
CO0035 # 07 Y:1985 07 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,638 $4,302 Implemented
UD0168 # 01 Y:1985 01 1985 INSTALL SET-BACK TIMERS $2,610 $1,000 Implemented
UD0168 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $688 $300 Not Implemented
UD0168 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,217 $896 Not Implemented
UD0168 # 04 Y:1985 04 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $536 $0 Not Implemented
UD0168 # 05 Y:1985 05 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $506 $0 Implemented
UD0169 # 01 Y:1985 01 1985 INSTALL STORM WINDOWS AND DOORS $2,965 $3,680 Not Implemented
UD0169 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,315 $178 Implemented
UD0169 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $849 $0 Implemented
UD0170 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,355 $1,543 Implemented
TN0251 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $23,955 $205 Not Implemented
TN0251 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,204 $300 Implemented
TN0251 # 03 Y:1985 03 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $340 $0 Implemented
TN0253 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,628 $375 Not Implemented
TN0253 # 02 Y:1985 02 1985 INSTALL SET-BACK TIMERS $380 $0 Not Implemented
TN0253 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $102 $119 Not Implemented
TN0253 # 04 Y:1985 04 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $327 $420 Not Implemented
TN0253 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $54 $40 Not Implemented
TN0255 # 01 Y:1985 01 1985 USE HEAT PUMP FOR SPACE CONDITIONING $1,340 $2,000 Not Implemented