Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0572 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,373 | $200 | Implemented |
SF0572 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,781 | $1,200 | Implemented |
SF0572 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $332 | $67 | Not Implemented |
SF0572 # 04 Y:2021 | 04 | 2021 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $33,236 | $25,695 | Not Implemented |
SF0572 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,961 | $45,208 | Not Implemented |
SF0572 # 06 Y:2021 | 06 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,350 | $4,996 | Not Implemented |
SF0572 # 07 Y:2021 | 07 | 2021 | REPLACE BOILER | $14,321 | $72,000 | Not Implemented |
SF0572 # 08 Y:2021 | 08 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $343,451 | $2,394,442 | Not Implemented |
SF0572 # 09 Y:2021 | 09 | 2021 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $134,491 | $56,667 | Not Implemented |
SF0572 # 10 Y:2021 | 10 | 2021 | INSTALL SUB-METERING EQUIPMENT | $8,446 | $6,896 | Implemented |
SD0613 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,677 | $16,500 | Implemented |
SD0613 # 02 Y:2021 | 02 | 2021 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $8,370 | $5,000 | Implemented |
SD0613 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,201 | $1,065 | Implemented |
SD0613 # 04 Y:2021 | 04 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $590 | $1,500 | Not Implemented |
SD0613 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $218 | $2,500 | Implemented |
SD0612 # 01 Y:2021 | 01 | 2021 | REDESIGN PROCESS | $39,942 | $13,000 | Implemented |
SD0612 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,879 | $12,356 | Implemented |
SD0612 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,826 | $9,545 | Implemented |
SD0612 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $957 | $0 | Implemented |
SD0612 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,530 | $9,245 | Not Implemented |
SD0612 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,883 | $2,800 | Not Implemented |
SD0612 # 07 Y:2021 | 07 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,829 | $44,568 | Not Implemented |
SD0612 # 08 Y:2021 | 08 | 2021 | REPAIR AND ELIMINATE STEAM LEAKS | $557 | $1,000 | Implemented |
SD0611 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $30,193 | $22,050 | Implemented |
SD0611 # 02 Y:2021 | 02 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,709 | $10,350 | Not Implemented |