IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0131 # 01 Y:2013 01 2013 INSULATE BARE EQUIPMENT $25,536 $2,554 Implemented
MZ0131 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $10,439 $345 Implemented
MZ0131 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,218 $5,587 Implemented
MZ0131 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $2,807 $1,380 Implemented
MZ0131 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,179 $1,148 Implemented
MZ0131 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,084 $600 Implemented
MZ0131 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $759 $1,019 Implemented
MZ0131 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $213 $310 Implemented
MZ0116 # 01 Y:2013 01 2013 USE PHOTOCELL CONTROLS $2,023 $900 Not Implemented
MZ0116 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,131 $0 Not Implemented
MZ0116 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $890 $1,000 Not Implemented
MZ0116 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,715 $93,750 Not Implemented
MZ0116 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,431 $1,160 Not Implemented
MZ0128 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,032 $90,880 Implemented
MZ0128 # 02 Y:2013 02 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $1,584 $0 Implemented
MZ0128 # 03 Y:2013 03 2013 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,679 $0 Not Implemented
MZ0128 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,270 $400 Implemented
MZ0128 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,891 $1,160 Implemented
MZ0128 # 06 Y:2013 06 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,045 $150 Implemented
MZ0128 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $218 $190 Implemented
MZ0128 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $418 $1,000 Implemented
MZ0128 # 09 Y:2013 09 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $717 $2,000 Implemented
MZ0127 # 01 Y:2013 01 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $0 $0 Implemented
MZ0127 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $13,741 $16,000 Implemented
MZ0127 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,890 $57,890 Not Implemented