Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,443
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0345 # 02 Y:1991 | 02 | 1991 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $3,220 | $1,500 | Implemented |
KU0345 # 03 Y:1991 | 03 | 1991 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,154 | $2,200 | Implemented |
KU0345 # 04 Y:1991 | 04 | 1991 | REDUCE VENTILATION AIR | $1,505 | $200 | Implemented |
KU0345 # 05 Y:1991 | 05 | 1991 | USE OPTIMUM THICKNESS INSULATION | $374 | $600 | Implemented |
KU0345 # 06 Y:1991 | 06 | 1991 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,461 | $5,300 | Implemented |
KU0345 # 07 Y:1991 | 07 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $618 | $950 | Implemented |
KU0345 # 08 Y:1991 | 08 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $715 | $300 | Implemented |
KU0345 # 09 Y:1991 | 09 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $536 | $60 | Implemented |
KU0345 # 10 Y:1991 | 10 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,528 | $1,000 | Implemented |
KU0345 # 11 Y:1991 | 11 | 1991 | INSTALL SET-BACK TIMERS | $796 | $950 | Implemented |
KU0345 # 12 Y:1991 | 12 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $169 | $0 | Implemented |
KU0345 # 13 Y:1991 | 13 | 1991 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $439 | $1,429 | Implemented |
KU0345 # 14 Y:1991 | 14 | 1991 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $968 | $0 | Not Implemented |
KU0346 # 01 Y:1991 | 01 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,719 | $500 | Implemented |
KU0346 # 02 Y:1991 | 02 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,121 | $200 | Implemented |
KU0346 # 03 Y:1991 | 03 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,943 | $0 | Implemented |
KU0346 # 04 Y:1991 | 04 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $197 | $250 | Implemented |
KU0346 # 05 Y:1991 | 05 | 1991 | INSTALL SET-BACK TIMERS | $1,059 | $100 | Implemented |
KU0346 # 06 Y:1991 | 06 | 1991 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $470 | $825 | Implemented |
KU0346 # 07 Y:1991 | 07 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $121 | $109 | Implemented |
KU0346 # 08 Y:1991 | 08 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $453 | $100 | Implemented |
KU0346 # 09 Y:1991 | 09 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $311 | $0 | Implemented |
KU0346 # 10 Y:1991 | 10 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $201 | $0 | Implemented |
KU0347 # 01 Y:1991 | 01 | 1991 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,274 | $25,000 | Not Implemented |
KU0347 # 02 Y:1991 | 02 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,542 | $27,500 | Not Implemented |