IAC logo
IAC Assessment: KU0410
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0410
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1993
Principal Product Battery Chargers
NAICS n/a
SIC 3694 - Engine Electrical Equipment
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 57,000
Annual Production 110,000 Pieces
Production Hrs. Annual 4,480
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,728 1,408,265 kWh $0.05
Natural Gas $94,239 12,803 MMBtu $7.36
TOTAL ENERGY COSTS $164,967
RECOMMENDED SAVINGS* $21,243 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$11,139
Cost:
$4,300
- - $11,139 3,024 - - -
-
kWh
$11,139
3,024
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,103
Cost:
$8,550
- - - - $3,103 - -
-
kWh
-
-
MMBtu
$3,103
-
$
03: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$2,797
Cost:
$7,300
$1,457 29,015 $1,340 323 - - $1,457
29,015
kWh
$1,340
323
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,730
Cost:
$3,154
- - $1,730 411 - - -
-
kWh
$1,730
411
MMBtu
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$810
Cost:
$57
$810 16,120 - - - - $810
16,120
kWh
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$471
Cost:
$1,650
$471 9,379 - - - - $471
9,379
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$380
Cost:
$748
$162 3,224 - - $218 - $162
3,224
kWh
-
-
MMBtu
$218
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$324
Cost:
$201
$324 6,448 - - - - $324
6,448
kWh
-
-
MMBtu
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$250
Cost:
$260
$250 4,982 - - - - $250
4,982
kWh
-
-
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$239
Cost:
$400
$239 4,689 - - - - $239
4,689
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,243
Cost:
$26,620
$3,713 73,857 $14,209 3,758 $3,321 - $3,713
73,857
kWh
$14,209
3,758
MMBtu
$3,321
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes