IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0255 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,207 $1,640 Implemented
TN0255 # 03 Y:1985 03 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $340 $250 Implemented
TN0255 # 04 Y:1985 04 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $255 $560 Not Implemented
TN0255 # 05 Y:1985 05 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $238 $265 Implemented
TN0255 # 06 Y:1985 06 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $119 $0 Not Implemented
TN0255 # 07 Y:1985 07 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $51 $0 Implemented
TN0258 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,018 $3,600 Implemented
TN0258 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,644 $120 Implemented
TN0258 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $765 $1,200 Implemented
TN0258 # 04 Y:1985 04 1985 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,362 $3,000 Not Implemented
TS0024 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,555 $25 Not Implemented
TS0024 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $842 $214 Not Implemented
TS0024 # 03 Y:1985 03 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $168 $105 Not Implemented
TS0024 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,617 $4,028 Not Implemented
TS0024 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,293 $3,000 Not Implemented
TS0024 # 06 Y:1985 06 1985 INSTALL STORM WINDOWS AND DOORS $281 $140 Not Implemented
TS0030 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $50,700 $500 Not Implemented
TS0030 # 02 Y:1985 02 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,867 $2,550 Not Implemented
TS0030 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,867 $100 Not Implemented
TS0030 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $3,209 $75 Not Implemented
ST0029 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,962 $525 Not Implemented
ST0029 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $452 $182 Not Implemented
ST0029 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $2,594 $8,405 Not Implemented
ST0029 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,045 $1,600 Not Implemented
ST0029 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $4,470 $8,786 Not Implemented