Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,377
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0255 # 02 Y:1985 | 02 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $1,207 | $1,640 | Implemented |
TN0255 # 03 Y:1985 | 03 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $340 | $250 | Implemented |
TN0255 # 04 Y:1985 | 04 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $255 | $560 | Not Implemented |
TN0255 # 05 Y:1985 | 05 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $238 | $265 | Implemented |
TN0255 # 06 Y:1985 | 06 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $119 | $0 | Not Implemented |
TN0255 # 07 Y:1985 | 07 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $51 | $0 | Implemented |
TN0258 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,018 | $3,600 | Implemented |
TN0258 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,644 | $120 | Implemented |
TN0258 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $765 | $1,200 | Implemented |
TN0258 # 04 Y:1985 | 04 | 1985 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,362 | $3,000 | Not Implemented |
TS0024 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,555 | $25 | Not Implemented |
TS0024 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $842 | $214 | Not Implemented |
TS0024 # 03 Y:1985 | 03 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $168 | $105 | Not Implemented |
TS0024 # 04 Y:1985 | 04 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,617 | $4,028 | Not Implemented |
TS0024 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,293 | $3,000 | Not Implemented |
TS0024 # 06 Y:1985 | 06 | 1985 | INSTALL STORM WINDOWS AND DOORS | $281 | $140 | Not Implemented |
TS0030 # 01 Y:1985 | 01 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $50,700 | $500 | Not Implemented |
TS0030 # 02 Y:1985 | 02 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,867 | $2,550 | Not Implemented |
TS0030 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,867 | $100 | Not Implemented |
TS0030 # 04 Y:1985 | 04 | 1985 | AIR CONDITION ONLY SPACE NECESSARY | $3,209 | $75 | Not Implemented |
ST0029 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,962 | $525 | Not Implemented |
ST0029 # 02 Y:1985 | 02 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $452 | $182 | Not Implemented |
ST0029 # 03 Y:1985 | 03 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,594 | $8,405 | Not Implemented |
ST0029 # 04 Y:1985 | 04 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,045 | $1,600 | Not Implemented |
ST0029 # 05 Y:1985 | 05 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,470 | $8,786 | Not Implemented |