Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0210 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $93,984 | $5,553 | Not Implemented |
DL0210 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $17,648 | $50,000 | Not Implemented |
DL0210 # 07 Y:2022 | 07 | 2022 | REDUCE EXCESSIVE BOILER BLOWDOWN | $17,995 | $0 | Not Implemented |
DL0210 # 08 Y:2022 | 08 | 2022 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,443 | $20,000 | Not Implemented |
DL0210 # 09 Y:2022 | 09 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $86,400 | $1,000,000 | Not Implemented |
KS2206 # 01 Y:2022 | 01 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $8,106 | $0 | Not Implemented |
KS2206 # 02 Y:2022 | 02 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $5,185 | $0 | Not Implemented |
KS2206 # 03 Y:2022 | 03 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,067 | $4,835 | Implemented |
KS2206 # 04 Y:2022 | 04 | 2022 | ISOLATE HOT OR COLD EQUIPMENT | $2,342 | $3,334 | Implemented |
KS2206 # 05 Y:2022 | 05 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $741 | $390 | Implemented |
KS2206 # 06 Y:2022 | 06 | 2022 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $397 | $0 | Implemented |
KS2206 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,386 | $4,602 | Not Implemented |
KS2206 # 08 Y:2022 | 08 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $85,249 | $849,734 | Not Implemented |
AS0528 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $212 | $845 | Not Implemented |
NL0071 # 01 Y:2022 | 01 | 2022 | REPLACE BOILER | $280,847 | $220,000 | Not Implemented |
NL0071 # 02 Y:2022 | 02 | 2022 | MINIMIZE WATER USAGE | $106,955 | $72,150 | Implemented |
NL0071 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,879 | $30,410 | Implemented |
NL0071 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,139 | $8,000 | Not Implemented |
NL0071 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $2,400 | $9,724 | Implemented |
NL0071 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,447 | $4,500 | Implemented |
NL0071 # 07 Y:2022 | 07 | 2022 | INSULATE BARE EQUIPMENT | $407 | $2,521 | Implemented |
AM0853 # 01 Y:2022 | 01 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $74,850 | $5,000 | Implemented |
AM0853 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $17,040 | $19,415 | Not Implemented |
AM0853 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,530 | $13,140 | Implemented |
AM0853 # 04 Y:2022 | 04 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,455 | $4,175 | Not Implemented |