IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,152

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0148 # 05 Y:1982 05 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,136 $375 Not Implemented
GT0148 # 04 Y:1982 04 1982 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $16,150 $10,000 Not Implemented
GT0148 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,080 $833 Not Implemented
GT0148 # 02 Y:1982 02 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $195 $500 Not Implemented
GT0143 # 05 Y:1982 05 1982 MODIFY TEXTILE DRYERS $2,082 $0 Not Implemented
GT0143 # 04 Y:1982 04 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,150 $0 Not Implemented
GT0143 # 03 Y:1982 03 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,745 $8,834 Not Implemented
GT0143 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,843 $500 Not Implemented
GT0143 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,698 $7,508 Not Implemented
GT0142 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,895 $500 Implemented
GT0142 # 04 Y:1982 04 1982 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $8,610 $6,000 Not Implemented
GT0142 # 03 Y:1982 03 1982 MODIFY DYE BECK $2,476 $16,000 Not Implemented
GT0142 # 02 Y:1982 02 1982 MODIFY TEXTILE DRYERS $2,578 $0 Implemented
GT0142 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $614 $1,000 Not Implemented
GT0158 # 03 Y:1982 03 1982 INSULATE BARE EQUIPMENT $1,163 $448 Not Implemented
GT0158 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,305 $107 Not Implemented
GT0158 # 01 Y:1982 01 1982 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,543 $17,096 Not Implemented
GT0153 # 05 Y:1982 05 1982 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,865 $1,860 Not Implemented
GT0153 # 04 Y:1982 04 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,549 $0 Not Implemented
GT0153 # 03 Y:1982 03 1982 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,945 $9,000 Not Implemented
GT0153 # 02 Y:1982 02 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,545 $625 Not Implemented
GT0153 # 01 Y:1982 01 1982 INSTALL TIMERS AND/OR THERMOSTATS $4,196 $903 Not Implemented
GT0151 # 07 Y:1982 07 1982 INSULATE BARE EQUIPMENT $646 $1,609 Not Implemented
GT0151 # 06 Y:1982 06 1982 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,374 $9,000 Not Implemented
GT0151 # 05 Y:1982 05 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40,030 $29,973 Not Implemented