IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,746

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0145 # 03 Y:1984 03 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,294 $320 Not Implemented
OK0145 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $168 $180 Not Implemented
OK0145 # 05 Y:1984 05 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $460 $0 Not Implemented
OK0145 # 06 Y:1984 06 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $384 $80 Not Implemented
OK0145 # 07 Y:1984 07 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $183 $0 Not Implemented
OK0145 # 08 Y:1984 08 1984 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $206 $472 Not Implemented
OK0145 # 09 Y:1984 09 1984 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,724 $10,340 Not Implemented
OK0146 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $142 $525 Not Implemented
OK0146 # 02 Y:1984 02 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $176 $450 Not Implemented
OK0146 # 03 Y:1984 03 1984 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $28 $0 Implemented
OK0146 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50 $46 Implemented
OK0146 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $234 $0 Not Implemented
OK0146 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,352 $13,552 Not Implemented
OK0146 # 07 Y:1984 07 1984 INSULATE BARE EQUIPMENT $1,971 $204 Implemented
UD0125 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,583 $11,079 Implemented
UD0125 # 02 Y:1984 02 1984 COVER OPEN TANKS $1,611 $1,080 Implemented
UD0125 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,474 $5,156 Implemented
UD0126 # 01 Y:1984 01 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,095 $1,000 Implemented
UD0126 # 02 Y:1984 02 1984 DISCONNECT BALLASTS $1,386 $2,310 Implemented
UD0126 # 03 Y:1984 03 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,630 $0 Implemented
UD0128 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,370 $0 Implemented
UD0128 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,748 $9,000 Implemented
UD0128 # 03 Y:1984 03 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,410 $2,000 Not Implemented
UD0129 # 01 Y:1984 01 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $76,534 $250,000 Not Implemented
UD0129 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $723 $601 Not Implemented