Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,629
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0266 # 01 Y:1988 | 01 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,611 | $600 | Implemented |
UD0266 # 02 Y:1988 | 02 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $462 | $0 | Implemented |
UD0266 # 03 Y:1988 | 03 | 1988 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,213 | $7,000 | Not Implemented |
UD0266 # 04 Y:1988 | 04 | 1988 | REPAIR AND ELIMINATE STEAM LEAKS | $21,603 | $5,000 | Implemented |
UD0266 # 05 Y:1988 | 05 | 1988 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $23,169 | $20,000 | Implemented |
UD0266 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,639 | $11,475 | Implemented |
UD0266 # 07 Y:1988 | 07 | 1988 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $9,266 | $30,000 | Implemented |
UD0266 # 08 Y:1988 | 08 | 1988 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $155,320 | $875,000 | Not Implemented |
UD0267 # 01 Y:1988 | 01 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,625 | $0 | Implemented |
UD0267 # 02 Y:1988 | 02 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,250 | $0 | Not Implemented |
UD0267 # 03 Y:1988 | 03 | 1988 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $10,439 | $4,448 | Implemented |
UD0267 # 04 Y:1988 | 04 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,285 | $552 | Implemented |
AT0110 # 01 Y:1988 | 01 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,131 | $5,540 | Implemented |
AT0110 # 02 Y:1988 | 02 | 1988 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $25,785 | $5,000 | Implemented |
AT0110 # 03 Y:1988 | 03 | 1988 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,765 | $3,500 | Implemented |
AT0110 # 04 Y:1988 | 04 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,784 | $0 | Not Implemented |
AT0110 # 05 Y:1988 | 05 | 1988 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $21,453 | $21,000 | Implemented |
AT0110 # 06 Y:1988 | 06 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,955 | $33,000 | Not Implemented |
AT0110 # 07 Y:1988 | 07 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,558 | $5,000 | Implemented |
AT0110 # 08 Y:1988 | 08 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $378 | $331 | Implemented |
AT0110 # 09 Y:1988 | 09 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $705 | $1,500 | Implemented |
AT0110 # 10 Y:1988 | 10 | 1988 | IMPROVE LUBRICATION PRACTICES | $994 | $0 | Not Implemented |
AT0110 # 11 Y:1988 | 11 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $622 | $0 | Implemented |
AT0111 # 01 Y:1988 | 01 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $39,530 | $60,000 | Not Implemented |
AT0111 # 02 Y:1988 | 02 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $715 | $0 | Implemented |