IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0266 # 01 Y:1988 01 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,611 $600 Implemented
UD0266 # 02 Y:1988 02 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $462 $0 Implemented
UD0266 # 03 Y:1988 03 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,213 $7,000 Not Implemented
UD0266 # 04 Y:1988 04 1988 REPAIR AND ELIMINATE STEAM LEAKS $21,603 $5,000 Implemented
UD0266 # 05 Y:1988 05 1988 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $23,169 $20,000 Implemented
UD0266 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,639 $11,475 Implemented
UD0266 # 07 Y:1988 07 1988 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,266 $30,000 Implemented
UD0266 # 08 Y:1988 08 1988 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $155,320 $875,000 Not Implemented
UD0267 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,625 $0 Implemented
UD0267 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,250 $0 Not Implemented
UD0267 # 03 Y:1988 03 1988 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,439 $4,448 Implemented
UD0267 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,285 $552 Implemented
AT0110 # 01 Y:1988 01 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,131 $5,540 Implemented
AT0110 # 02 Y:1988 02 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $25,785 $5,000 Implemented
AT0110 # 03 Y:1988 03 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,765 $3,500 Implemented
AT0110 # 04 Y:1988 04 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,784 $0 Not Implemented
AT0110 # 05 Y:1988 05 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $21,453 $21,000 Implemented
AT0110 # 06 Y:1988 06 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,955 $33,000 Not Implemented
AT0110 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $32,558 $5,000 Implemented
AT0110 # 08 Y:1988 08 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $378 $331 Implemented
AT0110 # 09 Y:1988 09 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $705 $1,500 Implemented
AT0110 # 10 Y:1988 10 1988 IMPROVE LUBRICATION PRACTICES $994 $0 Not Implemented
AT0110 # 11 Y:1988 11 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $622 $0 Implemented
AT0111 # 01 Y:1988 01 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,530 $60,000 Not Implemented
AT0111 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $715 $0 Implemented