Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina A&T |
---|---|
Assessment Year | 1988 |
Principal Product | MOTOR BRUSHES |
NAICS | n/a |
SIC | 3624 - Carbon And Graphite Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 270 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 50,000,000 Pieces |
Production Hrs. Annual | 7,488 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $241,457 | 5,701,055 | kWh | $0.04 |
TOTAL ENERGY COSTS | $241,457 | |||
RECOMMENDED SAVINGS* | $112,130 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $102,397 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $18,131 Cost: $5,540 |
$18,131 | 428,195 | - | - | - | - |
$18,131 428,195 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $25,785 Cost: $5,000 |
$25,785 | 609,027 | - | - | - | - |
$25,785 609,027 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $2,765 Cost: $3,500 |
$2,765 | 65,358 | - | - | - | - |
$2,765 65,358 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $2,784 Cost: - |
$2,784 | - | - | - | - | - |
$2,784 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $21,453 Cost: $21,000 |
$21,453 | 506,741 | - | - | - | - |
$21,453 506,741 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,955 Cost: $33,000 |
$14,681 | 346,717 | $(-8,726) | (-1,479) | - | - |
$14,681 346,717 kWh |
$(-8,726) (-1,479) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $32,558 Cost: $5,000 |
$4,253 | 100,234 | - | - | $28,305 | - |
$4,253 100,234 kWh |
- - MMBtu |
$28,305 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $378 Cost: $331 |
$378 | 9,086 | - | - | - | - |
$378 9,086 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $705 Cost: $1,500 |
$705 | 16,706 | - | - | - | - |
$705 16,706 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $994 Cost: - |
$994 | 23,447 | - | - | - | - |
$994 23,447 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $622 Cost: - |
$622 | 14,654 | - | - | - | - |
$622 14,654 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $112,130 Cost: $74,871 |
$92,551 | 2,120,165 | $(-8,726) | (-1,479) | $28,305 | - | $92,551 2,120,165 kWh |
$(-8,726) (-1,479) MMBtu |
$28,305 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $102,397 Cost: $41,871 |
$74,092 | 1,750,001 | - | - | $28,305 | - | $74,092 1,750,001 kWh |
- - MMBtu |
$28,305 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes |