IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144,270

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1015 # 04 Y:2022 04 2022 REPLACE BOILER $9,756 $43,140 Implemented
CM1015 # 05 Y:2022 05 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $578 $1,310 Not Implemented
CM1015 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $139,944 $1,455,428 Not Implemented
CM1015 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,380 $23,925 Implemented
MZ0340 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,529 $720 Implemented
MZ0340 # 02 Y:2023 02 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,688 $320 Implemented
MZ0340 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,810 $3,202 Not Implemented
MZ0340 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $618 $260 Implemented
MZ0340 # 05 Y:2023 05 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,940 $4,520 Not Implemented
MZ0340 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,084 $18,000 Not Implemented
MZ0340 # 07 Y:2023 07 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $188,061 $900,000 Not Implemented
MZ0340 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,531 $5,336 Implemented
CM1014 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $75,700 $662,500 n/a
CM1014 # 02 Y:2022 02 2022 USE RADIANT HEATER FOR SPOT HEATING $5,400 $3,600 n/a
CM1014 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,968 $600 n/a
CM1014 # 04 Y:2022 04 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $400 $1,500 n/a
AS0541 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $116,802 $60,350 Not Implemented
AS0541 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,906 $8,806 Not Implemented
AS0541 # 03 Y:2022 03 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $357 $826 Not Implemented
AS0541 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $253 $1,056 Not Implemented
AS0541 # 05 Y:2022 05 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $484 $840 Not Implemented
CM1013 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $10,211 $116,226 Not Implemented
CM1013 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,342 $3,480 Not Implemented
CM1013 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,819 $3,590 Not Implemented
CM1013 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $465 $260 Not Implemented