IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,636

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0224 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $26,018 $50,000 n/a
MS0224 # 08 Y:2003 08 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $12,652 $0 Not Implemented
MS0224 # 09 Y:2003 09 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,477 $1,560 Not Implemented
MS0224 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,641 $181 Implemented
MS0224 # 11 Y:2003 11 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,861 $7,596 Implemented
MS0224 # 12 Y:2003 12 2003 INSULATE BARE EQUIPMENT $3,422 $301 Not Implemented
MS0228 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,861 $6,210 Not Implemented
MS0228 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,344 $276 Implemented
MS0228 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,499 $2,540 Implemented
MS0228 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,237 $1,210 Not Implemented
MS0228 # 05 Y:2003 05 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $323 $0 Implemented
MS0228 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $90 $157 Not Implemented
MS0227 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,277 $0 Not Implemented
MS0227 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,782 $5,356 Implemented
MS0227 # 03 Y:2003 03 2003 USE RADIANT HEATER FOR SPOT HEATING $2,347 $400 Implemented
MS0227 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,123 $477 Implemented
MS0227 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,437 $742 Not Implemented
MS0227 # 06 Y:2003 06 2003 INSTALL TIMERS AND/OR THERMOSTATS $494 $708 Not Implemented
MS0226 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,996 $0 Not Implemented
MS0226 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,859 $2,372 Implemented
MS0226 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,660 $1,669 Not Implemented
MS0226 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,417 $205 Implemented
MS0226 # 05 Y:2003 05 2003 INSTALL TIMERS AND/OR THERMOSTATS $886 $591 Not Implemented
MS0225 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,764 $670 Implemented
MS0225 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,290 $4,667 Implemented