IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144,270

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0050 # 07 Y:1995 07 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,773 $25,000 Not Implemented
SF0050 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,930 $900 Implemented
SF0050 # 09 Y:1995 09 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $478,218 $653,645 Not Implemented
WV0054 # 01 Y:1995 01 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,021 $0 Implemented
WV0054 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,161 $500 Implemented
WV0054 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,306 $690 Implemented
WV0054 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,787 $1,000 Implemented
WV0054 # 05 Y:1995 05 1995 USE SYNTHETIC LUBRICANT $988 $0 Implemented
WV0054 # 06 Y:1995 06 1995 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $23,617 $15,458 Implemented
WV0054 # 07 Y:1995 07 1995 REDUCE SCRAP PRODUCTION $244,471 $36,720 Implemented
HO0095 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,143 $3,677 Not Implemented
HO0095 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,588 $3,686 Not Implemented
HO0095 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $566 $200 Not Implemented
HO0095 # 04 Y:1995 04 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,498 $121,200 Not Implemented
HO0095 # 05 Y:1995 05 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,047 $1,500 Not Implemented
OD0022 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,327 $25,510 Implemented
OD0022 # 02 Y:1995 02 1995 METER WASTE WATER $6,284 $1,521 Implemented
OD0022 # 03 Y:1995 03 1995 MODERATE COOLING TOWER OUTLET TEMPERATURE $3,379 $0 Not Implemented
OD0022 # 04 Y:1995 04 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,277 $4,655 Implemented
OD0022 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,120 $4,008 Implemented
OD0022 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,353 $3,562 Implemented
OD0022 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,807 $400 Implemented
OK0463 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,078 $23,140 Implemented
OK0463 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,020 $3,000 Implemented
OK0463 # 03 Y:1995 03 1995 UPGRADE CONTROLS ON COMPRESSORS $4,172 $2,500 Not Implemented