IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,636

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0225 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,074 $1,368 Not Implemented
MS0225 # 04 Y:2003 04 2003 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,449 $400 Not Implemented
MS0225 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $244 $296 Not Implemented
MS0223 # 01 Y:2003 01 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $33,740 $0 Not Implemented
MS0223 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,538 $8,188 Implemented
MS0223 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,532 $411 Implemented
MS0223 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,878 $4,320 Not Implemented
MS0223 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,829 $3,710 Not Implemented
MS0223 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,537 $1,000 Implemented
MS0223 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,081 $355 Not Implemented
MS0223 # 08 Y:2003 08 2003 INSTALL TIMERS AND/OR THERMOSTATS $400 $355 Implemented
MS0221 # 01 Y:2003 01 2003 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $202,950 $8,100 Implemented
MS0221 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,072 $12,006 Not Implemented
MS0221 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,834 $782 Implemented
MS0221 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $460 $585 Not Implemented
MS0219 # 01 Y:2002 01 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $529,152 $198,480 Not Implemented
MS0219 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $425,529 $1,452,000 Not Implemented
MS0219 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $67,886 $1,950 Implemented
MS0219 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $44,270 $30,411 Not Implemented
MS0219 # 05 Y:2002 05 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $23,617 $1,500 Implemented
MS0219 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,902 $97 Implemented
MS0219 # 07 Y:2002 07 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,779 $1,113 Implemented
MS0219 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,971 $696 Implemented
MS0219 # 09 Y:2002 09 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $18,200 $0 Not Implemented
MS0217 # 01 Y:2002 01 2002 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $236,267 $271,000 Not Implemented