IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0044 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,210 $3,508 Not Implemented
UU0044 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,130 $0 Implemented
UU0044 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,390 $5,000 Not Implemented
UU0044 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,476 $800 Implemented
UU0044 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,070 $0 Not Implemented
UU0044 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,211 $7,976 Not Implemented
UU0043 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $3,833 $5,820 Not Implemented
UU0043 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,032 $0 Not Implemented
UU0043 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,718 $32,302 Implemented
UU0043 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,467 $1,500 Not Implemented
UU0043 # 05 Y:2003 05 2003 USE SYNTHETIC LUBRICANT $4,235 $400 Not Implemented
UU0043 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $790 $400 Not Implemented
UU0043 # 07 Y:2003 07 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,677 $0 Implemented
UU0043 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $816 $406 Not Implemented
UU0042 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $15,620 $8,000 Not Implemented
UU0042 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,027 $1,500 Not Implemented
UU0042 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $550 Not Implemented
UU0042 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,960 $0 Not Implemented
UU0042 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,836 $20,051 Not Implemented
UU0042 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $406 Not Implemented
UU0042 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $792 $2,296 Not Implemented
UU0042 # 08 Y:2003 08 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,607 $100,240 Not Implemented
UU0041 # 01 Y:2003 01 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,352 $2,000 n/a
UU0041 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,207 $3,500 n/a
UU0041 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $1,080 $950 n/a