IAC logo
IAC Assessment: UU0057
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0057
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product ice cream
NAICS 311514 - Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2024 - Ice Cream And Frozen Desserts
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 48,000
Annual Production 2,125 Thousand Gallons
Production Hrs. Annual 2,080
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,278 3,326,880 kWh $0.03
Electricity Demand $83,219 10,274 kW-months/year $8.10
Electricity Fees $15,852 - $ -
Natural Gas $33,380 7,940 MMBtu $4.20
TOTAL ENERGY COSTS $266,605
RECOMMENDED SAVINGS* $47,561 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$792
Cost:
$100
$295 9,780 $497 56 - - - - $295
9,780
kWh
$497
56
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$829
Cost:
$20
$309 10,260 $520 59 - - - - $309
10,260
kWh
$520
59
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$279
Cost:
$129
$104 3,459 $175 20 - - - - $104
3,459
kWh
$175
20
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,240
Cost:
$6,450
- - - - $2,240 546 - - -
-
kWh
-
-
kW-months/year
$2,240
546
MMBtu
-
-
Tgal
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$4,493
Cost:
$25,000
- - - - $4,181 1,019 $312 65,000 -
-
kWh
-
-
kW-months/year
$4,181
1,019
MMBtu
$312
65,000
Tgal
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,110
Cost:
$2,000
- - - - $4,110 1,001 - - -
-
kWh
-
-
kW-months/year
$4,110
1,001
MMBtu
-
-
Tgal
07: 2.1222 INSTALL TURBULATORS Savings:
$1,680
Cost:
$1,747
- - - - $1,680 409 - - -
-
kWh
-
-
kW-months/year
$1,680
409
MMBtu
-
-
Tgal
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,320
Cost:
$809
- - - - $1,320 321 - - -
-
kWh
-
-
kW-months/year
$1,320
321
MMBtu
-
-
Tgal
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,920
Cost:
-
- - $5,920 672 - - - - -
-
kWh
$5,920
672
kW-months/year
-
-
MMBtu
-
-
Tgal
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$398
Cost:
$20
$151 4,990 $247 28 - - - - $151
4,990
kWh
$247
28
kW-months/year
-
-
MMBtu
-
-
Tgal
11: 3.3132 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL Savings:
$25,500
Cost:
$192,450
- - - - - - $25,500 7,040,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,500
7,040,000
Tgal
TOTAL RECOMMENDED Savings:
$47,561
Cost:
$228,725
$859 28,489 $7,359 835 $13,531 3,296 $25,812 7,105,000 $859
28,489
kWh
$7,359
835
kW-months/year
$13,531
3,296
MMBtu
$25,812
7,105,000
Tgal
TOTAL IMPLEMENTED Savings:
$7,110
Cost:
$120
$446 14,770 $6,664 756 - - - - $446
14,770
kWh
$6,664
756
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal