Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2004 |
Principal Product | ice cream |
NAICS | 311514 - Dry, Condensed, and Evaporated Dairy Product Manufacturing |
SIC | 2024 - Ice Cream And Frozen Desserts |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 48,000 |
Annual Production | 2,125 Thousand Gallons |
Production Hrs. Annual | 2,080 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $92,278 | 3,326,880 | kWh | $0.03 |
Electricity Demand | $83,219 | 10,274 | kW-months/year | $8.10 |
Electricity Fees | $15,852 | - | $ | - |
Natural Gas | $33,380 | 7,940 | MMBtu | $4.20 |
TOTAL ENERGY COSTS | $266,605 | |||
RECOMMENDED SAVINGS* | $47,561 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,110 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $792 Cost: $100 |
$295 | 9,780 | $497 | 56 | - | - | - | - |
$295 9,780 kWh |
$497 56 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $829 Cost: $20 |
$309 | 10,260 | $520 | 59 | - | - | - | - |
$309 10,260 kWh |
$520 59 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $279 Cost: $129 |
$104 | 3,459 | $175 | 20 | - | - | - | - |
$104 3,459 kWh |
$175 20 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,240 Cost: $6,450 |
- | - | - | - | $2,240 | 546 | - | - |
- - kWh |
- - kW-months/year |
$2,240 546 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $4,493 Cost: $25,000 |
- | - | - | - | $4,181 | 1,019 | $312 | 65,000 |
- - kWh |
- - kW-months/year |
$4,181 1,019 MMBtu |
$312 65,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,110 Cost: $2,000 |
- | - | - | - | $4,110 | 1,001 | - | - |
- - kWh |
- - kW-months/year |
$4,110 1,001 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1222 INSTALL TURBULATORS |
Savings: $1,680 Cost: $1,747 |
- | - | - | - | $1,680 | 409 | - | - |
- - kWh |
- - kW-months/year |
$1,680 409 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,320 Cost: $809 |
- | - | - | - | $1,320 | 321 | - | - |
- - kWh |
- - kW-months/year |
$1,320 321 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $5,920 Cost: - |
- | - | $5,920 | 672 | - | - | - | - |
- - kWh |
$5,920 672 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $398 Cost: $20 |
$151 | 4,990 | $247 | 28 | - | - | - | - |
$151 4,990 kWh |
$247 28 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.3132 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL |
Savings: $25,500 Cost: $192,450 |
- | - | - | - | - | - | $25,500 | 7,040,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$25,500 7,040,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,561 Cost: $228,725 |
$859 | 28,489 | $7,359 | 835 | $13,531 | 3,296 | $25,812 | 7,105,000 | $859 28,489 kWh |
$7,359 835 kW-months/year |
$13,531 3,296 MMBtu |
$25,812 7,105,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,110 Cost: $120 |
$446 | 14,770 | $6,664 | 756 | - | - | - | - | $446 14,770 kWh |
$6,664 756 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |