IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0888 # 13 Y:2013 13 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,444 $4,500 Not Implemented
UD0888 # 14 Y:2013 14 2013 DEVELOP A REPAIR/REPLACE POLICY $3,770 $0 Implemented
UD0888 # 15 Y:2013 15 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $913 $2,119 Not Implemented
UD0888 # 16 Y:2013 16 2013 INSULATE BARE EQUIPMENT $6,807 $894 Not Implemented
UD0888 # 17 Y:2013 17 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,679 $5,000 Not Implemented
UD0888 # 18 Y:2013 18 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $21,538 $2,500 Not Implemented
UD0888 # 19 Y:2013 19 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $262,538 $700,000 Not Implemented
UD0888 # 20 Y:2013 20 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $412 $0 Implemented
UD0888 # 21 Y:2013 21 2013 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $4,400 $0 Implemented
NC0495 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $1,753 $5,222 Not Implemented
NC0495 # 02 Y:2013 02 2013 ADD AREA LIGHTING SWITCHES $3,238 $1,650 Not Implemented
NC0495 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $4,114 $7,500 Not Implemented
NC0495 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $615 $3,797 Not Implemented
NC0495 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,495 $1,041 Not Implemented
NC0495 # 06 Y:2013 06 2013 DEVELOP A REPAIR/REPLACE POLICY $813 $3,663 Not Implemented
NC0495 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,730 $60,000 Not Implemented
NC0495 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $748 $100 Not Implemented
NC0495 # 09 Y:2013 09 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $123 $600 Not Implemented
NC0495 # 10 Y:2013 10 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $1,400 $100 Not Implemented
LE0367 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,354 $9,800 Not Implemented
LE0367 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,213 $15,750 Implemented
LE0367 # 03 Y:2013 03 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,711 $0 Implemented
LE0367 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,606 $15,100 Not Implemented
LE0367 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,516 $1,350 Implemented
LE0367 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,165 $16,000 Not Implemented