IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144,009

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0081 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $200 Not Implemented
HO0081 # 04 Y:1994 04 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,819 $2,000 Not Implemented
ND0193 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $29,083 $135,000 Not Implemented
ND0193 # 02 Y:1994 02 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $18,916 $30,800 Implemented
ND0193 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,402 $900 Implemented
ND0193 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,791 $7,970 Not Implemented
ND0193 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,101 $1,580 Implemented
ND0193 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,621 $260 Implemented
ND0193 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $202 $690 Not Implemented
MA0312 # 01 Y:1994 01 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,799 $2,827 Not Implemented
MA0312 # 02 Y:1994 02 1994 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $4,017 $80,000 Implemented
MA0312 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,870 $6,854 Not Implemented
MA0312 # 04 Y:1994 04 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $372 $1,094 Implemented
MA0312 # 05 Y:1994 05 1994 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,394 $35,728 Implemented
MA0312 # 06 Y:1994 06 1994 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,280 $700 Not Implemented
UD0436 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $11,729 $21,000 Implemented
UD0436 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,122 $0 Not Implemented
UD0436 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $4,381 $7,000 Implemented
UD0436 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,299 $15,139 Implemented
UD0436 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $533 $518 Not Implemented
KG0005 # 01 Y:1994 01 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $56,492 $1,260 Implemented
KG0005 # 02 Y:1994 02 1994 INSTALL TIMERS AND/OR THERMOSTATS $6,211 $2,900 Implemented
KG0005 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,505 $43,160 Implemented
KG0005 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,345 $1,125 Implemented
KG0005 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,042 $2,500 Implemented