IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,647

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0203 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,102 $2,259 Not Implemented
WI0203 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $227 $300 Not Implemented
WI0203 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,743 $2,844 Implemented
WI0203 # 06 Y:1994 06 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,974 $0 Not Implemented
WI0203 # 07 Y:1994 07 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $422 $0 Not Implemented
WI0203 # 08 Y:1994 08 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,439 $3,115 Not Implemented
WI0203 # 09 Y:1994 09 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,175 $1,700 Implemented
WI0203 # 10 Y:1994 10 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $590 $200 Not Implemented
WI0203 # 11 Y:1994 11 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $286 $0 Not Implemented
WI0203 # 12 Y:1994 12 1994 REDUCE SCRAP PRODUCTION $2,000 $300 Not Implemented
WI0203 # 13 Y:1994 13 1994 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $2,500 $500 Not Implemented
SD0076 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,070 $3,970 Implemented
SD0076 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,732 $20 Implemented
SD0076 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $263 $512 Implemented
SD0076 # 04 Y:1994 04 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,814 $1,235 Not Implemented
SD0076 # 05 Y:1994 05 1994 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $3,031 $3,180 Implemented
SD0076 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,666 $1,516 Implemented
SD0076 # 07 Y:1994 07 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $1,072 $2,416 Implemented
SD0076 # 08 Y:1994 08 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $231 $175 Implemented
SD0076 # 09 Y:1994 09 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $457 $552 Implemented
SD0076 # 10 Y:1994 10 1994 INSTALL OCCUPANCY SENSORS $1,267 $3,760 Implemented
SD0076 # 11 Y:1994 11 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,149 $630 Implemented
CO0297 # 01 Y:1994 01 1994 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $21,300 $16,000 Not Implemented
CO0297 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,150 $34,110 Not Implemented
CO0297 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,820 $3,430 Implemented