IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,604

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0427 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $182 $193 Implemented
MA0297 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $10,409 $15,400 Not Implemented
MA0297 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,461 $30 Implemented
MA0297 # 03 Y:1994 03 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,339 $5,980 Not Implemented
MA0297 # 04 Y:1994 04 1994 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $795 $816 Implemented
MA0297 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $60 $594 Not Implemented
MA0297 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $245 $0 Implemented
KU0424 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $242 $3,578 Not Implemented
KU0424 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $667 $450 Not Implemented
KU0424 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $566 $1,534 Not Implemented
KU0424 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,757 $375 Not Implemented
KU0424 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $556 $200 Not Implemented
KU0424 # 06 Y:1994 06 1994 REDUCE VENTILATION AIR $156 $0 Not Implemented
NC0019 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,350 $270 Implemented
NC0019 # 02 Y:1994 02 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,400 $3,500 Not Implemented
NC0019 # 03 Y:1994 03 1994 USE POWER DURING OFF-PEAK PERIODS $7,853 $0 Not Implemented
NC0019 # 04 Y:1994 04 1994 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,311 $680 Not Implemented
NC0019 # 05 Y:1994 05 1994 REDUCE VENTILATION AIR $17,508 $85,800 Not Implemented
ME0125 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $50 Implemented
ME0125 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,070 $450 Implemented
ME0125 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $763 $0 Implemented
ME0125 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $951 $400 Not Implemented
ME0125 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $634 $500 Implemented
ME0125 # 06 Y:1994 06 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $990 $960 Implemented
ME0126 # 01 Y:1994 01 1994 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $25,970 $68,000 Not Implemented