Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,575
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0179 # 03 Y:1990 | 03 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,908 | $2,350 | Not Implemented |
MA0179 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $554 | $70 | Implemented |
MA0177 # 01 Y:1990 | 01 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,107 | $14,700 | Not Implemented |
MA0177 # 02 Y:1990 | 02 | 1990 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $10,876 | $21,853 | Not Implemented |
MA0177 # 03 Y:1990 | 03 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $822 | $120 | Implemented |
MA0177 # 04 Y:1990 | 04 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,411 | $8,500 | Implemented |
MA0172 # 03 Y:1990 | 03 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,721 | $326 | Implemented |
MA0172 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $499 | $168 | Implemented |
MA0172 # 02 Y:1990 | 02 | 1990 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,911 | $2,000 | Implemented |
MA0162 # 01 Y:1989 | 01 | 1989 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $936 | $75 | Implemented |
MA0162 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $665 | $50 | Not Implemented |
MA0162 # 03 Y:1989 | 03 | 1989 | INSTALL EFFICIENT RECTIFIERS | $14,209 | $8,500 | Not Implemented |
MA0162 # 04 Y:1989 | 04 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,765 | $400 | Not Implemented |
MA0162 # 05 Y:1989 | 05 | 1989 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $636 | $1,041 | Not Implemented |
MA0162 # 06 Y:1989 | 06 | 1989 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,259 | $14,920 | Not Implemented |
MA0162 # 07 Y:1989 | 07 | 1989 | INSTALL SET-BACK TIMERS | $712 | $150 | Not Implemented |
MA0157 # 01 Y:1989 | 01 | 1989 | INSTALL SET-BACK TIMERS | $363 | $175 | Not Implemented |
MA0157 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,976 | $466 | Implemented |
MA0157 # 03 Y:1989 | 03 | 1989 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $545 | $584 | Not Implemented |
MA0157 # 04 Y:1989 | 04 | 1989 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,203 | $6,025 | Not Implemented |
MA0157 # 05 Y:1989 | 05 | 1989 | TURN OFF EQUIPMENT WHEN NOT IN USE | $106 | $0 | Implemented |
MA0153 # 01 Y:1989 | 01 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $632 | $217 | Not Implemented |
MA0153 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $878 | $163 | Implemented |
MA0153 # 03 Y:1989 | 03 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,825 | $500 | Implemented |
MA0153 # 04 Y:1989 | 04 | 1989 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $19,722 | $115,000 | Not Implemented |