IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,514

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0195 # 04 Y:1993 04 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,037 $1,050 Not Implemented
WI0195 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $859 $0 Not Implemented
WI0195 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $206 $350 Not Implemented
WI0195 # 07 Y:1993 07 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $671 $0 Implemented
WI0195 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $384 $588 Not Implemented
WI0195 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $132 $0 Not Implemented
WI0195 # 10 Y:1993 10 1993 INSULATE BARE EQUIPMENT $187 $660 Not Implemented
UD0421 # 01 Y:1994 01 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $61,963 $15,000 Implemented
UD0421 # 02 Y:1994 02 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,164 $30,000 Not Implemented
UD0421 # 03 Y:1994 03 1994 MINIMIZE WATER USAGE $65,878 $40,000 Not Implemented
UD0421 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,191 $37,559 Implemented
UD0421 # 05 Y:1994 05 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $32,472 $30,000 Not Implemented
UD0421 # 06 Y:1994 06 1994 REPAIR OR REPLACE STEAM TRAPS $8,304 $10,000 Not Implemented
OK0423 # 01 Y:1994 01 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,501 $5,000 n/a
OK0423 # 02 Y:1994 02 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,402 $2,800 n/a
OK0423 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $901 $3,906 n/a
OK0423 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $662 $0 n/a
OK0423 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $296 $0 n/a
OK0423 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $266 $880 n/a
OR0196 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,028 $2,000 Implemented
OR0196 # 02 Y:1994 02 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,951 $1,800 Implemented
OR0196 # 03 Y:1994 03 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,766 $17,137 Implemented
OR0196 # 04 Y:1994 04 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $310 $341 Not Implemented
OR0196 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $1,302 Not Implemented
OR0196 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $2,738 Implemented