IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0430 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,938 $2,450 Not Implemented
TN0430 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $1,526 $0 Not Implemented
TN0430 # 07 Y:1991 07 1991 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $1,477 $0 Not Implemented
TN0430 # 08 Y:1991 08 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,412 $620 Not Implemented
TN0430 # 09 Y:1991 09 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,462 $0 Not Implemented
TN0430 # 10 Y:1991 10 1991 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,165 $799 Not Implemented
TN0430 # 11 Y:1991 11 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,034 $3,340 Not Implemented
TN0430 # 12 Y:1991 12 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,839 $3,550 Not Implemented
TN0430 # 13 Y:1991 13 1991 AIR CONDITION ONLY SPACE NECESSARY $427 $675 Not Implemented
TN0436 # 01 Y:1991 01 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $26,217 $1,204 Implemented
TN0436 # 02 Y:1991 02 1991 REPAIR AND ELIMINATE STEAM LEAKS $9,331 $500 Implemented
TN0436 # 03 Y:1991 03 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,936 $12,057 Implemented
TN0436 # 04 Y:1991 04 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,440 $0 Implemented
TN0436 # 05 Y:1991 05 1991 KEEP LAMPS AND REFLECTORS CLEAN $3,626 $0 Implemented
TN0436 # 06 Y:1991 06 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,646 $19,100 Implemented
TN0436 # 07 Y:1991 07 1991 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $487 $0 Implemented
TN0436 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $162 $392 Implemented
GT0440 # 01 Y:1991 01 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $945 $500 Implemented
GT0440 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,354 $795 Implemented
GT0440 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,910 $17,250 Implemented
GT0440 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $3,743 $2,160 Implemented
GT0440 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,210 $650 Implemented
GT0440 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $532 $593 Implemented
GT0440 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $898 $0 Implemented
GT0440 # 08 Y:1991 08 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,580 $70,000 Implemented