Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,573
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0064 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $382 | $888 | Implemented |
IP0064 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $893 | $3,007 | Implemented |
IP0063 # 01 Y:2016 | 01 | 2016 | MODIFY STARTUP/SHUTDOWN TIMES | $2,912 | $0 | Not Implemented |
IP0063 # 02 Y:2016 | 02 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,741 | $0 | Not Implemented |
IP0063 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $170 | $5 | Implemented |
IP0063 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $416 | $3 | Implemented |
IP0063 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $215 | $36 | Implemented |
IP0063 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $2,624 | $683 | Not Implemented |
IP0063 # 07 Y:2016 | 07 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $839 | $586 | Not Implemented |
IP0063 # 08 Y:2016 | 08 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $268 | $240 | Not Implemented |
IP0063 # 09 Y:2016 | 09 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $113 | $112 | Implemented |
IP0063 # 10 Y:2016 | 10 | 2016 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $5,185 | $9,768 | Implemented |
IP0063 # 11 Y:2016 | 11 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,006 | $2,156 | Implemented |
IP0062 # 01 Y:2016 | 01 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $13,450 | $7 | Implemented |
IP0062 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $967 | $22 | Implemented |
IP0062 # 03 Y:2016 | 03 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $605 | $0 | Not Implemented |
IP0062 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $19,981 | $2,354 | Not Implemented |
IP0062 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,081 | $4,092 | Not Implemented |
IP0062 # 06 Y:2016 | 06 | 2016 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,743 | $2,278 | Not Implemented |
IP0062 # 07 Y:2016 | 07 | 2016 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,609 | $12,262 | Not Implemented |
IP0061 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,775 | $4 | Implemented |
IP0061 # 02 Y:2016 | 02 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,745 | $0 | Implemented |
IP0061 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,196 | $35 | Implemented |
IP0061 # 04 Y:2016 | 04 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $931 | $20 | Implemented |
IP0061 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $5,310 | $1,611 | Implemented |