Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1046 # 13 Y:2022 | 13 | 2022 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $127,137 | $75,000 | Implemented |
UD1046 # 14 Y:2022 | 14 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $386,941 | $554,028 | Implemented |
UD1046 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $22,214 | $200,000 | Implemented |
UD1046 # 02 Y:2022 | 02 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,323 | $0 | Not Implemented |
UD1046 # 03 Y:2022 | 03 | 2022 | IMPROVE COMBUSTION CONTROL CAPABILITY | $261,813 | $100 | Not Implemented |
UD1046 # 04 Y:2022 | 04 | 2022 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $43,076 | $3,500 | Implemented |
UD1046 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,795 | $3,279 | Not Implemented |
UD1046 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,166 | $0 | Implemented |
UD1046 # 07 Y:2022 | 07 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,615 | $1,500 | Not Implemented |
UD1046 # 08 Y:2022 | 08 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $27,755 | $60,000 | Not Implemented |
UD1046 # 09 Y:2022 | 09 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,495 | $1,200 | Not Implemented |
UD1046 # 10 Y:2022 | 10 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,940 | $0 | Not Implemented |
UD1046 # 11 Y:2022 | 11 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,765 | $4,001 | Not Implemented |
MI0409 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO HEAT WATER | $24,802 | $108,191 | Not Implemented |
MI0409 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,919 | $1,980 | Not Implemented |
MI0409 # 03 Y:2022 | 03 | 2022 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,003 | $14,690 | Implemented |
MI0409 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,496 | $240 | Not Implemented |
MI0409 # 05 Y:2022 | 05 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,094 | $1,885 | Implemented |
MI0409 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $235 | $700 | Implemented |
MI0409 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $222 | $363 | Implemented |
UA0260 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,881 | $1,000 | Not Implemented |
UA0260 # 02 Y:2022 | 02 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,710 | $1,651 | Implemented |
UA0260 # 03 Y:2022 | 03 | 2022 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $429,299 | $2,825,211 | Not Implemented |
UA0260 # 04 Y:2022 | 04 | 2022 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $230,787 | $328,350 | Not Implemented |
UA0260 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $90,617 | $35,347 | Implemented |