IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0035 # 06 Y:1985 06 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,512 $9,450 Not Implemented
LT0025 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $154 $300 Implemented
LT0025 # 02 Y:1985 02 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $537 $670 Implemented
LT0025 # 03 Y:1985 03 1985 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $6,134 $500 Implemented
LT0025 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $531 $400 Implemented
LT0030 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,893 $4,000 Implemented
LT0030 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,950 $0 Not Implemented
LT0030 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,165 $1,500 Not Implemented
LT0030 # 04 Y:1985 04 1985 COVER OPEN TANKS $11,697 $1,512 Not Implemented
LT0030 # 05 Y:1985 05 1985 INSULATE BARE EQUIPMENT $5,358 $8,532 Not Implemented
LT0031 # 01 Y:1985 01 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,755 $1,167 Implemented
LT0031 # 02 Y:1985 02 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $821 $88 Implemented
LT0031 # 03 Y:1985 03 1985 USE OPTIMUM TEMPERATURE $5,175 $15,000 Implemented
PV0003 # 02 Y:1985 02 1985 USE RADIANT HEATER FOR SPOT HEATING $253 $1,650 Not Implemented
PV0004 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,014 $129 Not Implemented
PV0004 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,526 $27 Not Implemented
PV0004 # 03 Y:1985 03 1985 USE RADIANT HEATER FOR SPOT HEATING $1,012 $4,800 Not Implemented
PV0004 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $616 $1,181 Not Implemented
PV0004 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,166 $79 Not Implemented
PV0004 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,428 $0 Not Implemented
PV0003 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $478 $0 Not Implemented
TS0024 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,555 $25 Not Implemented
TS0024 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $842 $214 Not Implemented
TS0024 # 03 Y:1985 03 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $168 $105 Not Implemented
TS0024 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,617 $4,028 Not Implemented