IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TS0024 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,293 $3,000 Not Implemented
TS0024 # 06 Y:1985 06 1985 INSTALL STORM WINDOWS AND DOORS $281 $140 Not Implemented
TS0030 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $50,700 $500 Not Implemented
TS0030 # 02 Y:1985 02 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,867 $2,550 Not Implemented
TS0030 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,867 $100 Not Implemented
TS0030 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $3,209 $75 Not Implemented
UD0168 # 01 Y:1985 01 1985 INSTALL SET-BACK TIMERS $2,610 $1,000 Implemented
UD0168 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $688 $300 Not Implemented
UD0168 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,217 $896 Not Implemented
UD0168 # 04 Y:1985 04 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $536 $0 Not Implemented
UD0168 # 05 Y:1985 05 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $506 $0 Implemented
UD0169 # 01 Y:1985 01 1985 INSTALL STORM WINDOWS AND DOORS $2,965 $3,680 Not Implemented
UD0169 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,315 $178 Implemented
UD0169 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $849 $0 Implemented
UD0170 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,355 $1,543 Implemented
ST0033 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,091 $340 Not Implemented
ST0033 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,963 $0 Implemented
ST0033 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $576 $100 Implemented
ST0033 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $853 $200 Not Implemented
ST0033 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,080 $1,900 Implemented
ST0033 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $1,488 $0 Not Implemented
ST0033 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $1,100 $3,100 Not Implemented
ST0033 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,936 $537 Implemented
ST0033 # 09 Y:1985 09 1985 ELIMINATE LEAKS IN WATER LINES AND VALVES $504 $40 Implemented
ST0033 # 10 Y:1985 10 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,126 $1,770 Not Implemented