Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Stevens Institute of Technology |
---|---|
Assessment Year | 1985 |
Principal Product | STEEL WIRE |
NAICS | n/a |
SIC | 3315 - Steel Wire And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 78 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 30,000 Tons |
Production Hrs. Annual | 6,000 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $251,688 | 3,036,049 | kWh | $0.08 |
Natural Gas | $260,251 | 42,671 | MMBtu | $6.10 |
Fuel Oil #4 | $84,149 | 14,419 | MMBtu | $5.84 |
TOTAL ENERGY COSTS | $596,088 | |||
RECOMMENDED SAVINGS* | $67,900 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,443 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #4 | Electricity Usage | Natural Gas | Fuel Oil #4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,091 Cost: $340 |
$1,091 | 13,189 | - | - | - | - |
$1,091 13,189 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,963 Cost: - |
$5,963 | 72,098 | - | - | - | - |
$5,963 72,098 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $576 Cost: $100 |
$576 | 7,034 | - | - | - | - |
$576 7,034 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $853 Cost: $200 |
$853 | 10,258 | - | - | - | - |
$853 10,258 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $6,080 Cost: $1,900 |
$6,080 | - | - | - | - | - |
$6,080 - kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,488 Cost: - |
- | - | $1,488 | 249 | - | - |
- - kWh |
$1,488 249 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,100 Cost: $3,100 |
- | - | $1,100 | 184 | - | - |
- - kWh |
$1,100 184 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,936 Cost: $537 |
- | - | - | - | $1,936 | 332 |
- - kWh |
- - MMBtu |
$1,936 332 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $504 Cost: $40 |
- | - | - | - | $504 | 86 |
- - kWh |
- - MMBtu |
$504 86 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $4,126 Cost: $1,770 |
- | - | - | - | $4,126 | 707 |
- - kWh |
- - MMBtu |
$4,126 707 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH |
Savings: $4,383 Cost: $87 |
- | - | - | - | $4,383 | 751 |
- - kWh |
- - MMBtu |
$4,383 751 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $384 Cost: - |
- | - | $384 | 64 | - | - |
- - kWh |
$384 64 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $39,416 Cost: $45,000 |
- | - | - | - | $39,416 | 6,749 |
- - kWh |
- - MMBtu |
$39,416 6,749 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $67,900 Cost: $53,074 |
$14,563 | 102,579 | $2,972 | 497 | $50,365 | 8,625 | $14,563 102,579 kWh |
$2,972 497 MMBtu |
$50,365 8,625 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,443 Cost: $2,577 |
$12,619 | 79,132 | $384 | 64 | $2,440 | 418 | $12,619 79,132 kWh |
$384 64 MMBtu |
$2,440 418 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #4 | Electricity Usage | Natural Gas | Fuel Oil #4 |