Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0143 # 03 Y:1999 | 03 | 1999 | UPGRADE CONTROLS ON COMPRESSORS | $2,739 | $140 | Not Implemented |
OD0143 # 04 Y:1999 | 04 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $228 | $130 | Implemented |
OD0143 # 05 Y:1999 | 05 | 1999 | SELL COMBUSTIBLE WASTE | $1,835 | $0 | Not Implemented |
TN0667 # 01 Y:1999 | 01 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $222,220 | $77,760 | Not Implemented |
TN0667 # 02 Y:1999 | 02 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $52,782 | $80,100 | Implemented |
TN0667 # 03 Y:1999 | 03 | 1999 | METER WASTE WATER | $26,280 | $2,980 | Implemented |
TN0667 # 04 Y:1999 | 04 | 1999 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $22,500 | $25,000 | Not Implemented |
TN0667 # 05 Y:1999 | 05 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $20,700 | $21,780 | Not Implemented |
TN0667 # 06 Y:1999 | 06 | 1999 | OPTIMIZE PLANT POWER FACTOR | $15,168 | $29,100 | Not Implemented |
OD0142 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,924 | $25,775 | Not Implemented |
OD0142 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $159 | $20 | Not Implemented |
OD0142 # 03 Y:1999 | 03 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,104 | $130 | Not Implemented |
OD0142 # 04 Y:1999 | 04 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,270 | $0 | Not Implemented |
OD0141 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,532 | $15,691 | Not Implemented |
OD0141 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $87 | $160 | Not Implemented |
OD0141 # 03 Y:1999 | 03 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $495 | $120 | Not Implemented |
OD0141 # 04 Y:1999 | 04 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $138,300 | $69,125 | Not Implemented |
OD0140 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,272 | $14,704 | Not Implemented |
OD0140 # 02 Y:1999 | 02 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,213 | $100 | Implemented |
OD0140 # 03 Y:1999 | 03 | 1999 | REDUCE VENTILATION AIR | $3,529 | $140 | Not Implemented |
OD0140 # 04 Y:1999 | 04 | 1999 | REDUCE VENTILATION AIR | $2,602 | $0 | Not Implemented |
OD0140 # 05 Y:1999 | 05 | 1999 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $510 | $1,870 | Not Implemented |
OD0139 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,834 | $61,640 | Not Implemented |
OD0139 # 02 Y:1999 | 02 | 1999 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $447 | $4,020 | Not Implemented |
OD0139 # 03 Y:1999 | 03 | 1999 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $82 | $20 | Not Implemented |