IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0259 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $2,333 $1,490 Not Implemented
OK0259 # 05 Y:1988 05 1988 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,873 $0 Not Implemented
OK0259 # 06 Y:1988 06 1988 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $7,709 $6,300 Not Implemented
OK0260 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $0 Not Implemented
OK0260 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,473 $525 Not Implemented
OK0260 # 04 Y:1988 04 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,831 $275 Not Implemented
OK0260 # 05 Y:1988 05 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,927 $1,500 Not Implemented
OK0260 # 06 Y:1988 06 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,063 $8,400 Not Implemented
OK0260 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $822 $740 Not Implemented
OK0260 # 08 Y:1988 08 1988 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,618 $1,200 Not Implemented
OK0262 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $15,713 $3,089 Implemented
OK0262 # 02 Y:1988 02 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,723 $0 Not Implemented
OK0262 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $495 $0 Implemented
OK0262 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,786 $0 Implemented
OK0262 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $982 $840 Implemented
OK0262 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,610 $9,800 Not Implemented
OR0023 # 01 Y:1988 01 1988 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $909 $1,200 Not Implemented
OR0023 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $374 $300 Implemented
OR0023 # 03 Y:1988 03 1988 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,134 $2,191 Not Implemented
OR0023 # 04 Y:1988 04 1988 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $400 $644 Not Implemented
OR0023 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $639 $1,346 Not Implemented
OR0024 # 01 Y:1988 01 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $821 $0 Implemented
OR0024 # 02 Y:1988 02 1988 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,315 $0 Not Implemented
OR0024 # 03 Y:1988 03 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $536 $300 Implemented
OR0024 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $146 $109 Implemented