IAC logo
IAC Assessment: OK0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1988
Principal Product DENIM JEANS
NAICS n/a
SIC 2325 - Men's and Boys' Separate Trousers and Slacks
Sales $50,000,000-$100,000,000
# of Employees 525
Plant Area (Sq.Ft.) 0
Annual Production 6,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $304,190 6,439,918 kWh $0.05
Natural Gas $113,366 27,217 MMBtu $4.17
TOTAL ENERGY COSTS $417,556
RECOMMENDED SAVINGS* $46,825 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,235
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$589
Cost:
$340
- - $589 142 - - -
-
kWh
$589
142
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,675
Cost:
$37,500
$20,145 443,728 - - $4,530 - $20,145
443,728
kWh
-
-
MMBtu
$4,530
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,646
Cost:
$900
- - $5,646 1,357 - - -
-
kWh
$5,646
1,357
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,333
Cost:
$1,490
- - $2,333 561 - - -
-
kWh
$2,333
561
MMBtu
-
-
$
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$5,873
Cost:
-
$5,873 135,991 - - - - $5,873
135,991
kWh
-
-
MMBtu
-
-
$
06: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$7,709
Cost:
$6,300
$7,709 177,902 - - - - $7,709
177,902
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$46,825
Cost:
$46,530
$33,727 757,621 $8,568 2,060 $4,530 - $33,727
757,621
kWh
$8,568
2,060
MMBtu
$4,530
-
$
TOTAL IMPLEMENTED Savings:
$6,235
Cost:
$1,240
- - $6,235 1,499 - - -
-
kWh
$6,235
1,499
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes