IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0008 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $694 $1,300 Implemented
MZ0008 # 05 Y:2007 05 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $812 $0 Implemented
MZ0008 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22 $23 Implemented
OR0518 # 01 Y:2007 01 2007 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $51,600 $120,000 Not Implemented
OR0518 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $1,020 $2,050 Implemented
OR0518 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $840 $4,100 Not Implemented
UA0006 # 01 Y:2007 01 2007 USE PHOTOCELL CONTROLS $112 $36 Not Implemented
UA0006 # 02 Y:2007 02 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,561 $1,023 Not Implemented
UA0006 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $40 $10 Not Implemented
UA0006 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $497 $216 Implemented
UA0006 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $358 $276 Implemented
UA0006 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $120 $0 Implemented
IA0409 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $579 $1,391 Implemented
IA0409 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,762 $12,621 Implemented
IA0409 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,004 $3,247 Implemented
IA0409 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $174 $462 Not Implemented
IA0409 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $125 $38 Implemented
IA0409 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,312 $25 Implemented
IA0409 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,664 $440 Implemented
IA0409 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $1,796 $450 Implemented
MI0154 # 01 Y:2007 01 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $99,787 $131,000 Not Implemented
MI0154 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,215 $73,710 Implemented
MI0154 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $30,511 $120 Implemented
MI0154 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $27,192 $1,450 Not Implemented
MI0154 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,388 $1,250 Not Implemented