Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,354
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0130 # 07 Y:1984 | 07 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,950 | $5,000 | Implemented |
KU0130 # 08 Y:1984 | 08 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $399 | $339 | Implemented |
KU0130 # 09 Y:1984 | 09 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $830 | $0 | Implemented |
KU0130 # 10 Y:1984 | 10 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,572 | $4,570 | Not Implemented |
KU0130 # 11 Y:1984 | 11 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $2,648 | $0 | Implemented |
KU0130 # 12 Y:1984 | 12 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,060 | $2,000 | Implemented |
KU0130 # 13 Y:1984 | 13 | 1984 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,949 | $3,200 | Not Implemented |
KU0130 # 14 Y:1984 | 14 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,068 | $800 | Implemented |
KU0130 # 15 Y:1984 | 15 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $0 | Implemented |
KU0130 # 16 Y:1984 | 16 | 1984 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $131 | $0 | Implemented |
KU0130 # 17 Y:1984 | 17 | 1984 | INSULATE BARE EQUIPMENT | $1,757 | $2,100 | Not Implemented |
KU0130 # 18 Y:1984 | 18 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $150 | $0 | Implemented |
KU0130 # 19 Y:1984 | 19 | 1984 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $262 | $0 | Implemented |
KU0130 # 20 Y:1984 | 20 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $105 | $0 | Implemented |
MA0002 # 01 Y:1984 | 01 | 1984 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,889 | $200 | Implemented |
MA0002 # 02 Y:1984 | 02 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,893 | $0 | Implemented |
MA0002 # 03 Y:1984 | 03 | 1984 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $13,950 | $22,000 | Not Implemented |
MA0003 # 01 Y:1984 | 01 | 1984 | REPAIR OR REPLACE STEAM TRAPS | $14,697 | $0 | Implemented |
MA0003 # 02 Y:1984 | 02 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $655 | $384 | Implemented |
MA0003 # 03 Y:1984 | 03 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $103,496 | $3,558 | Not Implemented |
TN0212 # 02 Y:1984 | 02 | 1984 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $6,363 | $10,000 | Not Implemented |
TN0212 # 03 Y:1984 | 03 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $2,822 | $1,240 | Not Implemented |
TN0212 # 04 Y:1984 | 04 | 1984 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $2,727 | $10,200 | Not Implemented |
TN0212 # 05 Y:1984 | 05 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,547 | $500 | Implemented |
TN0212 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $1,503 | $498 | Implemented |