IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0194 # 04 Y:1983 04 1983 INSTALL SET-BACK TIMERS $70 $824 Not Implemented
TN0194 # 05 Y:1983 05 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148 $850 Not Implemented
TN0194 # 06 Y:1983 06 1983 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $260 $296 Not Implemented
TN0195 # 01 Y:1983 01 1983 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,275 $0 Not Implemented
TN0195 # 02 Y:1983 02 1983 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,191 $0 Not Implemented
TN0195 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $4,562 $1,030 Not Implemented
TN0196 # 01 Y:1983 01 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,218 $150 Not Implemented
TN0196 # 02 Y:1983 02 1983 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $47 $0 Not Implemented
TN0197 # 01 Y:1983 01 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $1,035 $500 Not Implemented
TN0197 # 02 Y:1983 02 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $500 Not Implemented
TN0197 # 03 Y:1983 03 1983 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,170 $15,000 Not Implemented
TN0197 # 04 Y:1983 04 1983 INSULATE BARE EQUIPMENT $1,620 $634 Not Implemented
TN0197 # 05 Y:1983 05 1983 INCREASE AMOUNT OF CONDENSATE RETURNED $10,626 $27,000 Not Implemented
GT0200 # 01 Y:1983 01 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $373,500 $220,000 Not Implemented
GT0200 # 02 Y:1983 02 1983 MODIFY DYE BECK $36,666 $41,000 Not Implemented
GT0200 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $33,660 $30,000 Not Implemented
GT0200 # 04 Y:1983 04 1983 MODIFY TEXTILE DRYERS $46,800 $55,000 Not Implemented
GT0200 # 05 Y:1983 05 1983 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $9,885 $15,000 Not Implemented
GT0200 # 06 Y:1983 06 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $31,000 $22,000 Not Implemented
GT0201 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,132 $500 Implemented
GT0201 # 02 Y:1983 02 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,745 $50,000 Implemented
GT0201 # 03 Y:1983 03 1983 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $22,837 $10,000 Implemented
GT0201 # 04 Y:1983 04 1983 MODIFY DYE BECK $58,597 $101,000 Implemented
GT0201 # 05 Y:1983 05 1983 MODIFY DYE BECK $38,740 $51,000 Implemented
GT0201 # 06 Y:1983 06 1983 MODIFY TEXTILE DRYERS $33,809 $35,000 Implemented