IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0196 # 11 Y:1986 11 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $375 $0 Implemented
KU0196 # 12 Y:1986 12 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $210 $245 Implemented
KU0196 # 13 Y:1986 13 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,943 $1,940 Implemented
KU0197 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,730 $2,554 Implemented
KU0197 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,331 $380 Implemented
KU0197 # 03 Y:1986 03 1986 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $449 $14 Implemented
KU0197 # 04 Y:1986 04 1986 INSTALL AUTOMATIC STACK DAMPER $440 $700 Implemented
KU0197 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $170 $0 Implemented
KU0197 # 06 Y:1986 06 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $225 $40 Implemented
AT0038 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33 $32 Not Implemented
AT0038 # 02 Y:1986 02 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,018 $4,000 Not Implemented
AT0038 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48 $18 Not Implemented
AT0038 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $140 $150 Not Implemented
AT0038 # 05 Y:1986 05 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $95 $0 Not Implemented
AT0038 # 06 Y:1986 06 1986 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,567 $985 Not Implemented
AT0039 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $834 $859 Implemented
AT0039 # 02 Y:1986 02 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,360 $1,700 Not Implemented
AT0039 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $2,250 Implemented
AT0039 # 04 Y:1986 04 1986 INSULATE BARE EQUIPMENT $9,830 $1,640 Implemented
AT0039 # 05 Y:1986 05 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,108 $14,000 Implemented
AT0039 # 06 Y:1986 06 1986 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $46,699 $227 Implemented
CO0058 # 01 Y:1986 01 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,084 $450 Not Implemented
CO0058 # 02 Y:1986 02 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,231 $1,904 Implemented
CO0058 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $2,654 $1,100 Implemented
CO0058 # 04 Y:1986 04 1986 BURN WOOD BY-PRODUCTS FOR HEAT $27,671 $32,700 Implemented