IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0067 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,404 $500 Implemented
AR0067 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,363 $2,380 Implemented
AR0067 # 07 Y:1995 07 1995 USE RADIANT HEATER FOR SPOT HEATING $10,669 $10,000 Implemented
AR0067 # 08 Y:1995 08 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $13,200 $7,000 Implemented
CO0341 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,310 $16,550 Implemented
CO0341 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $830 $260 Implemented
CO0341 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $620 $650 Not Implemented
CO0341 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $260 Implemented
CO0341 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $250 $250 Implemented
UF0130 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,968 $10,600 Implemented
UF0130 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,122 $2,853 Implemented
UF0130 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $305 $448 Not Implemented
UF0130 # 04 Y:1995 04 1995 USE PHOTOCELL CONTROLS $1,056 $1,200 Implemented
UF0130 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,302 $350 Implemented
UF0130 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,815 $10,658 Implemented
UF0130 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $937 $162 Implemented
UF0130 # 08 Y:1995 08 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $54,080 $250,000 Not Implemented
UF0130 # 09 Y:1995 09 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,542 $12,000 Implemented
UF0130 # 10 Y:1995 10 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $49,911 $0 Not Implemented
UF0130 # 11 Y:1995 11 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $29,006 $285,418 Not Implemented
SF0070 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $602 $610 Implemented
SF0070 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,041 $9,983 Not Implemented
SF0070 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $2,395 $4,330 Not Implemented
SF0070 # 04 Y:1995 04 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,535 $14,820 Implemented
SF0070 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $1,695 $1,918 Implemented