IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

182

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0331 # 01 Y:2018 01 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,963 $15,690 Implemented
MI0331 # 02 Y:2018 02 2018 INCREASE EFFICIENCY OF TRUCKS $6,044 $5,800 Not Implemented
MI0331 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,170 $2,020 Not Implemented
MI0331 # 04 Y:2018 04 2018 PAY UTILITY BILLS ON TIME $4,461 $0 Implemented
MI0331 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,250 $1,400 Implemented
MI0331 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,515 $4,841 Not Implemented
MI0331 # 07 Y:2018 07 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,868 $531 Not Implemented
MI0331 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $1,823 $340 Not Implemented
MI0331 # 09 Y:2018 09 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,540 $480 Implemented
MI0331 # 10 Y:2018 10 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $962 $2,525 Implemented
MI0331 # 11 Y:2018 11 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $1,875 Implemented
MI0330 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $29,294 $1,300 Implemented
MI0330 # 02 Y:2018 02 2018 INCREASE EFFICIENCY OF TRUCKS $16,500 $12,760 Implemented
MI0330 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,180 $480 Implemented
MI0330 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,303 $7,234 Implemented
MI0330 # 05 Y:2018 05 2018 USE PHOTOCELL CONTROLS $7,073 $2,875 Implemented
MI0330 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $5,537 $7,669 Implemented
MI0330 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,299 $2,670 Implemented
MI0330 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,223 $7,807 Implemented
MI0330 # 09 Y:2018 09 2018 INSULATE BARE EQUIPMENT $1,778 $1,722 Not Implemented
MI0330 # 10 Y:2018 10 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,190 $1,160 Not Implemented
MI0330 # 11 Y:2018 11 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $794 $1,833 Implemented
MI0330 # 12 Y:2018 12 2018 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $608 $756 Implemented
UF0515 # 01 Y:2018 01 2018 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $293,173 $1,270,000 Not Implemented
UF0515 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,829 $63,355 Implemented