IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0014 # 05 Y:1991 05 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,374 $4,180 Implemented
UF0014 # 04 Y:1991 04 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $612 $420 Implemented
UF0014 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67 $265 Implemented
UF0014 # 02 Y:1991 02 1991 INSTALL SPECTRAL REFLECTORS / DELAMP $2,525 $8,430 Implemented
UF0014 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $408 $0 Implemented
UD0360 # 05 Y:1991 05 1991 REPLACE BOILER $13,756 $0 Not Implemented
UD0360 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $885 $0 Not Implemented
UD0360 # 03 Y:1991 03 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $931 $0 Not Implemented
UD0360 # 02 Y:1991 02 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,115 $0 Not Implemented
UD0360 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $3,936 $4,500 Not Implemented
UD0359 # 03 Y:1991 03 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $10,541 $10,000 Implemented
UD0359 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,528 $0 Implemented
UD0359 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,096 $0 Implemented
UD0358 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $959 $0 Implemented
UD0358 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,636 $0 Implemented
UD0358 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,170 $0 Implemented
UD0358 # 03 Y:1991 03 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,145 $200 Implemented
UD0358 # 02 Y:1991 02 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $675 $0 Implemented
UD0358 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,464 $7,000 Implemented
HO0010 # 04 Y:1991 04 1991 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $985 $200 Not Implemented
HO0010 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,137 $0 Not Implemented
HO0010 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $475 $1,195 Not Implemented
HO0010 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $0 Not Implemented
HO0009 # 05 Y:1991 05 1991 RECOVER AND REUSE COOLING WATER $5,366 $3,700 Not Implemented
HO0009 # 04 Y:1991 04 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,768 $0 Not Implemented