IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0335 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $0 Implemented
AM0335 # 06 Y:1998 06 1998 OPTIMIZE PLANT POWER FACTOR $525 $1,525 Not Implemented
AM0335 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $100 Implemented
AM0335 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $930 $2,585 Not Implemented
AM0335 # 03 Y:1998 03 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,025 $1,015 Implemented
AM0335 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,790 $250 Implemented
AM0335 # 01 Y:1998 01 1998 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $19,840 $320 Not Implemented
GT0654 # 08 Y:1998 08 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,740 $5,000 Implemented
GT0654 # 07 Y:1998 07 1998 MINIMIZE WATER USAGE $935 $1,100 Not Implemented
GT0654 # 06 Y:1998 06 1998 PAY UTILITY BILLS ON TIME $1,330 $0 Implemented
GT0654 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $0 Implemented
GT0654 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $737 $150 Implemented
GT0654 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $108 Not Implemented
GT0654 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $150 $52 Not Implemented
GT0654 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,734 $12,757 Not Implemented
AR0155 # 06 Y:1998 06 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $8,393 $10,000 Not Implemented
AR0155 # 05 Y:1998 05 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $5,204 $5,200 Not Implemented
AR0155 # 04 Y:1998 04 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $1,154 $304 Implemented
AR0155 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $43 $0 Implemented
AR0155 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24 $25 Implemented
AR0155 # 01 Y:1998 01 1998 REPLACE BOILER $2,248 $8,260 Implemented
UL0210 # 04 Y:1998 04 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $100,000 $200,000 Not Implemented
UL0210 # 03 Y:1998 03 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $22,000 $0 Implemented
UL0210 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $80,210 $43,420 Not Implemented
UL0210 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,828 $10,925 Not Implemented