IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MUCM25 # 03 Y:2025 03 2025 INSTALL OCCUPANCY SENSORS $350 $1,478 n/a
MUCM25 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43 $0 n/a
MUCM25 # 05 Y:2025 05 2025 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $359 $0 n/a
MUCM25 # 06 Y:2025 06 2025 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $193 $307 n/a
MUCM25 # 07 Y:2025 07 2025 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,443 $13,685 n/a
MUCM25 # 08 Y:2025 08 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $1,620 $12,320 n/a
UU0262 # 01 Y:2025 01 2025 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $12,361 $217,800 n/a
UU0262 # 02 Y:2025 02 2025 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $14,276 $180,000 n/a
UU0262 # 03 Y:2025 03 2025 INSULATE BARE EQUIPMENT $24,314 $29,878 n/a
UU0262 # 04 Y:2025 04 2025 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $13,561 $178,488 n/a
UU0262 # 05 Y:2025 05 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $762 $2,640 n/a
UU0262 # 06 Y:2025 06 2025 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $720 $1,680 n/a
UU0262 # 07 Y:2025 07 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,117 $834 n/a
UU0262 # 08 Y:2025 08 2025 OPTIMIZE PLANT POWER FACTOR $5,129 $12,300 n/a
TT0325 # 01 Y:2025 01 2025 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $242,348 $1,045,217 n/a
TT0325 # 02 Y:2025 02 2025 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $68,822 $200,000 n/a
TT0325 # 03 Y:2025 03 2025 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $30,978 $17,480 n/a
TT0325 # 04 Y:2025 04 2025 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,824 $22,500 n/a
TT0325 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,974 $16,000 n/a
TT0325 # 06 Y:2025 06 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $5,854 $400 n/a
TT0325 # 07 Y:2025 07 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,049 $30,040 n/a
TT0325 # 08 Y:2025 08 2025 INSTALL OCCUPANCY SENSORS $4,068 $15,000 n/a
TT0325 # 09 Y:2025 09 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,955 $1,000 n/a
TT0325 # 10 Y:2025 10 2025 METER WASTE WATER $1,047 $1,100 n/a
TT0325 # 11 Y:2025 11 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $718 $2,640 n/a