Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,449
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0373 # 06 Y:2025 | 06 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $155 | $0 | n/a |
MZ0373 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,241 | $120,000 | n/a |
MZ0373 # 04 Y:2025 | 04 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,800 | $5,600 | n/a |
MZ0373 # 03 Y:2025 | 03 | 2025 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,122 | $500 | n/a |
MZ0373 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,710 | $120 | n/a |
MZ0373 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,877 | $6,000 | n/a |
UD1110 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,358 | $0 | n/a |
UD1110 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,072 | $1,464 | n/a |
UD1110 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,927 | $8,803 | n/a |
UD1110 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $961 | $0 | n/a |
UD1110 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,733 | $17,500 | n/a |
UD1110 # 06 Y:2025 | 06 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,326 | $4,060 | n/a |
UD1110 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,182 | $953 | n/a |
UD1110 # 08 Y:2025 | 08 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,078 | $19,900 | n/a |
UD1110 # 09 Y:2025 | 09 | 2025 | OPTIMIZE PLANT POWER FACTOR | $27,844 | $76,225 | n/a |
TT0328 # 01 Y:2025 | 01 | 2025 | REDUCE OR ELIMINATE WASTE | $296,352 | $1,200,000 | n/a |
TT0328 # 02 Y:2025 | 02 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $184,128 | $600,000 | n/a |
TT0328 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $92,553 | $200,000 | n/a |
TT0328 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $81,754 | $144,000 | n/a |
TT0328 # 05 Y:2025 | 05 | 2025 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $52,760 | $41,250 | n/a |
TT0328 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,721 | $631,361 | n/a |
TT0328 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,908 | $60,000 | n/a |
TT0328 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,275 | $56,250 | n/a |
TT0328 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,237 | $50 | n/a |
TT0328 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,292 | $50 | n/a |