IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,500

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0126 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $4,241 $570 Not Implemented
OD0126 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,063 $2,063 Not Implemented
OD0126 # 04 Y:1999 04 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,606 $6,540 Not Implemented
OD0126 # 05 Y:1999 05 1999 IMPROVE COMBUSTION CONTROL CAPABILITY $1,540 $3,000 Implemented
OD0126 # 06 Y:1999 06 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,000 $0 Not Implemented
OD0126 # 07 Y:1999 07 1999 USE MAGNETIC TECHNOLOGY TO TREAT WATER $1,840 $3,500 Not Implemented
OD0126 # 08 Y:1999 08 1999 CLEAR AND RENT EXISTING SPACE $12,000 $0 Not Implemented
OD0125 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,283 $67,670 Implemented
OD0125 # 02 Y:1998 02 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $704 $840 Implemented
OD0125 # 03 Y:1998 03 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,650 $630 Implemented
OD0125 # 04 Y:1998 04 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,182 $8,000 Not Implemented
OD0125 # 05 Y:1998 05 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,293 $1,295 Not Implemented
OD0125 # 06 Y:1998 06 1998 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $619 $0 Implemented
OD0124 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,935 $6,012 Implemented
OD0124 # 02 Y:1998 02 1998 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $437 $1,290 Not Implemented
OD0124 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,225 $5,625 Not Implemented
OD0124 # 04 Y:1998 04 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,805 $4,595 Not Implemented
NC0153 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $541 $800 Not Implemented
NC0153 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,691 $18,850 Not Implemented
NC0153 # 03 Y:1998 03 1998 ADD AREA LIGHTING SWITCHES $91 $300 Not Implemented
NC0153 # 04 Y:1998 04 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,508 $500 Not Implemented
NC0153 # 05 Y:1998 05 1998 INSTALL SKYLIGHTS $10,344 $36,000 Not Implemented
NC0153 # 06 Y:1998 06 1998 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $3,423 $3,000 Not Implemented
NC0153 # 07 Y:1998 07 1998 CLEAR AND RENT EXISTING SPACE $28,000 $20,500 Not Implemented
TN0645 # 01 Y:1998 01 1998 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $408,630 $24,685 Implemented